Skip to main content

Planned Type

The table is accessible from Tables > Project Management > Planned Type.
The table contains the possible types of planning. It consists of a filter section where you can search by code and description, and a grid where all planned types will be listed (just click the Search button in the ribbon bar to view them).

Also within this form, it is possible to add new types within the grid by clicking the New button: this way, a new row will be added to the grid where the following information can be defined:

Code: this is the code of the planned type;

Description: this is the description of the code;

Not planned: if checked, it indicates that we are dealing with an unplanned type;

Numeration: indicates the associated numeration;

Intervention Type: indicates the default associated intervention type, along with the relevant description;

External/Internal: if checked, indicates that it is an external operation.

Color: color to identify planned interventions in the project area calendars, such as the Planner and WBS Resource Allocation.