Production Job Order
The document search form allows for the search of all documents in order to view, modify, and possibly delete them or proceed to the insertion of a new document; the window consists of a filter area and a result grid.
Once all desired filters are set, simply click the Search button present on the Ribbon bar to display the results within the result grid.
To open the details of a document, simply select it and double-click with the mouse, or click the Modify button (which allows entering the details and modifying them) or the View button (which allows entering the details and viewing them but without the ability to modify them).
See also:
Custom features, buttons, and common fields
Adding new fields in search forms
Based on the status of the order (thus scheduled, executive, etc.), the line of the order will have a different color. The colors that can be matched to the status of the order are established within the MPS Parameters, in the Job Order colors section.
From this form, it is also possible to create new orders, both monoproduct and multiproduct by clicking on the respective buttons available in the Ribbon Bar: Insert job order and Insert multiproduct job order.
By double-clicking on one of the orders present in the results grid, you will enter the details of the order, whose data will be further explored in the articles Insert New Monoproduct Job Order and Insert New Multiproduct Job Order.
The Valorized column, if the flag is active, indicates that the order already has at least one costing within it.
Specific buttons:
Duplicate Job Order: allows you to duplicate the selected order;
Change priority: allows you to change the priority assigned to the order;
Job Order Sequence: through this functionality, you can access the order sequence, where you can view the orders based on the sequence assigned to them, even through a chart;
Work center capacity: through this button, you can access the window related to the capacity of work centers; in this window, it is possible to visualize the commitment of that center by filtering by work center and for the desired time period using a chart and the list of expected production orders;
Production Job Order details: allows you to view the details of the order.