F.C.S. Resources

The table can be found at the path Tables > Production > F.C.S. Tables > F.C.S. Resources.

The data present in this table is used solely in the procedure for F.C.S. Scheduling.

This form allows for the management of production resources to be scheduled at finite capacity, whose type is associated with the processing phases. For each phase, the type of resource needed and the related quantity are indicated; the identifier of the individual resource is not specified.
For example, if a tool is needed, I will indicate on the phase what type of tool is required. There may be only one or more than one of that type of tool. Each of them will be defined and managed through this form.

Search for F.C.S. Resources

The form consists of a filtering area and a results area. Once all the desired filters are set, simply click the Search button to display the results within the results grid.

Insert F.C.S. Resources

To enter new codes, you must click on the first empty row in the grid or press the New button.

For the new record, at least the mandatory fields required by the program must be filled in: Code, Description, and F.C.S. Resource Type.

For everything not detailed in this document on the common operation of forms, please refer to the following link Common Features, Buttons, and Fields.