Measure units of corporate centers for controlling

The form can be found along the path: Tables > Controlling > Analytical Accounting > Measure units of corporate centers for controlling

In this table, we can specify, for example, that in the ANALYSIS area FINAL, the machinery X reads production data for direct costs and job costs based on the specified unit of measure for each business center regarding:

  • THE SETUP TIME
  • MAN TIME
  • MACHINE TIME

The three measures are not all mandatory, but depending on the center, one, two, or three dimensions will be valued.

There is also an indication of the validity of the rule.

For a different analysis area, such as BUDGET, it is possible to reason with other rules and other validity dates.

Table Fields

AREA / DESCRIPTION: Necessary to define to which analysis area the various logics being coded will refer.

BUSINESS CENTER / DESCRIPTION: Necessary to define to which business center the various logics being coded will refer.

SETUP TIME: Combo box that allows you to select the unit of measure to be used. The field is linked to the General Unit of Measure Table.

Manpower timing: Combo box that allows you to select the unit of measure to be used. The field is linked to the General Unit of Measure Table.

Machine time: Combo box that allows you to select the unit of measure to be used. The field is linked to the General Unit of Measure Table (Tabella generale Unità di misura).

FROM DATE / TO DATE: range of validity dates for the rule being set.

FLAG Use Setup / Man Time / Machine Time in Productivity Calculation: Act as "switches" to enable or disable the logic set in the corresponding row for the productivity calculation of the center.