Subcontractor Order Settings
The Subcontractor can be created from planning based on external work phases declared in the production order or can be created independently.
A series of Settings of a predefined tabular nature and a correct parameterization of the basic algorithms are recommended before proceeding with the generation of C/L orders.
Tables: it is advisable to refer to the section Configuration > Tables > Production to identify the correct settings for the Subcontractor module.
Parameters: the form is C/L Parameters.